This method statement defines the procedure step by step to implement the correct practices for installation of high voltage hv cable in order to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level.
Adequate room should be provided around the cable tray to allow for the set up of cable pulling equipment and to provide easy access for the installation of or removal of cables.
Verify tightness of accessible bolted electrical connections by calibrated torque wrench method in accordance with manufacturer s published data or table 100 12.
High voltage withstand testing 39 time leakage test 41.
Use of a low resistance ohmmeter in accordance with section 1 2 above.
High voltage conduit installation with trenchless methods.
3 3 installation of cables.
This article explains electrical power cables used in construction works complete with supply installation testing and commissioning of high voltage hv and low voltage lv cables.
Dc hipot testing measures the insulation resistance of cables by applying high voltage and measuring leakage current and the resistance is calculated using ohm s law.
Inspect bolted electrical connections for high resistance using one or more of the following methods.
A high voltage cable hv cable is a cable used for electric power transmission at high voltage a cable includes a conductor and insulation cables are considered to be fully insulated.
Power cable installation guide.
The first phase of the work starts with the installation of a pilot rope that acts as a foothold over the entire span of the bridge connecting the main towers and anchorages.
This means that they have a full rated insulation system which will consist of insulation semi con layers and a metallic shield.
Low ambient temperature.
The test voltage values for dc hi pot tests are based upon final factory test voltage which is.
The cable installation work of a bridge begins when the main towers and the cable anchorages are completed.
Power cable installation methods 1 installation methods and cable performances thermal mechanical other 2 underground installation 3 overhead installation 4 conduit installation 5 methods of installation according to iec 60364 46.
This type of test is usually performed after cable installation and repair.
Where cable trays are installed one above another allow 12 to 18 inches between cable trays and the ceiling.
All cables shall conform to standards of is 7098 1973 is 1554 1976 and wiring cables to is 694 1977 however contractor shall comply with the latest or superseded versions of is bis to be used for the complete.
Older energy plants are being closed newer plants utilizing natural gas are being constructed and alternative wind solar and other sources.