There is also a connection lug for the grounding wire which is bonded to the center neutral bus bar.
How to install electric meter base.
Anatomy of an electric meter.
480v delta or 277 480v wye 200 amp below service self contained metering with meter disconnect figure 16.
There is no requirement for how close or far from a building they should go but be sure to pick a spot that is convenient to get to and where you will have space to.
Electric house meters can only be installed by power companies.
The customer is responsible for obtaining permits and inspec.
Base of the post.
Install the rod in a location near the electrical panel.
Homeowners however can install the meter base.
Make sure that clearances around the meter socket area are in line with recommended guidelines.
Before starting the installation there are some steps that have to be followed.
Cut about 3 4 inch of the insulation off and remove it to uncover the copper wires.
The placement of this assembly must be correct and allow the utility company access when they require it.
American electric power company meter and service guide 4 figure 14.
The neutral bar is identified by a white marking or white electrical tape on the outer sheath.
The power company is responsible for bringing power to the site for installing the meter in the socket provided by the customer and for ener gizing the service.
Assemble the meter loop piping and base socket adhering to the regulations put in place by the supplying utility.
Install the neutral wire in the middle of the socket or to the neutral bar marked on the meter base.
Installing new electric service is a joint project between the customer and the power company.
The electrical meter is part of a meter loop which also contains a weatherhead and breaker box.
The nec or national electric code specifies that any electrical installation must comply with the residential code of the state where the installation is taking place.
Electrical meter boxes can be installed outdoors or indoors.
Meter loops must be built and installed to specifications set by the power company.
Ground rods need to be installed in the ground outside in a spot where they can be hammered 8 feet 2 4 m into the ground.