In figure 2 7 the service is overhead from the power company to the pole.
How to build an electric service pole.
This is either because the neutral and ground are connected together at a different point eg.
An electric service drop is the bundle of electrical cables that run from the electric utility company s power pole to the connection at your house.
Before any work is to be done it is advisable to check with the local power company for location of your service pole and height of your service pole.
You have 2 methods available to you to provide power to a building that is detached from your home electrical service.
Figure 1a shows a detached garage with an underground electrical service at minimum supplying outdoor lighting.
Contact our customer service department here or call 1 800 342 6978 for additional details.
Attach hub to the panel and screw the nipple tightly into the hub.
Making sure you are adhering to building electrical codes is critical to ensuring a safe and smooth pole barn build.
Figure 1a detached garage with underground electrical service.
If power will be supplied directly from the home service panel the.
All permits required to receive service are the responsibility of the member.
The electrical service for your camper cannot be permanently or hardwired to the service.
Take the electrical cable from your subpanel to the main electrical box.
Overhead service to a pole.
The meter or pole and one wire is doing dual duty as both neutral and ground or in some rare occasions the service has only one hot wire 110v only service.
Installing new electrical service power company connection.
Because the power company lines are higher than your home the cables that go to your home literally drop descending from a higher spot to a lower spot.
A licensed electrician should install the wiring between the meter pole and the building.
Locate the area where your subpanel will be placed and attach it.
Screw electrical bushing onto conduit and then into tophub of meter base and tighten.
From the pole the service could be overhead to the building or underground as shown here.
First disconnect the mains power to the electrical service end box and open it up.